Distance from the board
The run from the consumer unit to the parking space is the biggest single factor.
Installing a 7.4kW home chargepoint on its own dedicated circuit, with the board checked for capacity first and the work tested and certified.
A standard install on a straightforward property is a fixed price. Long cable runs, a board with no spare capacity, or an earthing arrangement that needs work will change it, so we check before quoting.
Three things, and all of them are answerable before we arrive.
The run from the consumer unit to the parking space is the biggest single factor.
The charger needs its own way on the board and enough supply behind it. If there is neither, the board comes first.
Some properties need additional earthing arrangements for an outdoor chargepoint, which is checked rather than assumed.
Core benefits every customer expects before they book.
Send the job details and you get a straight answer on what is involved and what happens next.
Your quote, updates, payments and receipts stay together.
Photos, access details and updates stay with the job from start to finish.
See a price where one is available. Any quoted work is agreed before it starts.
A charger is a dedicated circuit, not an outdoor socket.
A straightforward install is a single visit.
Tell us where you park, roughly how far that is from the board, and a photo of the board. That answers most of the price.
Power is off while the circuit is added, then the unit is commissioned and tested.
You get the certification and a walk through how the unit works before we leave.
Charging at home on its own protected circuit.
Basingstoke, Kempshott, Hatch Warren, Brighton Hill, Chineham, Popley, Old Basing and Lychpit, Hook, Fleet, Tadley, Overton, Bramley, Whitchurch
The things people ask before booking.
Not for regular charging. A charger draws a heavy sustained load and needs its own circuit and protection. A 13A socket is not designed for it.
It gets replaced as part of the job. Doing both in one visit is normally cheaper than a charger install followed by a board change.
We can, or you can buy your own unit and we install it. Tell us which before we quote.
Send a message with what you need and roughly when suits, and you will get a straight answer on price and timing.