EV charger installation in Chineham
Planning an EV charger in Chineham? JD Electricals checks your supply, earthing, spare board capacity and parking position before installing a dedicated charging circuit. Many homes around Great Binfields Road have modern consumer units, while shared parking courts need a closer look before the cable route can be confirmed.
Calls answered 24/7
- 17 years trading
Clear pricing for home EV charge points
We provide transparent, fixed written estimates covering the supply, installation and testing of your home charger, ensuring you know all details before work begins.
From £750
Included
- A look at the fuse board and the parking bay before we quote
- A written price for a 7.4kW home charge point
- The cable run from the board to the charger position
- Fitting and testing the home charger
- Showing you how to start a charge before we leave
Ways to pay


- Pay by bank
- Bank transfer
- The quoted price covers the charging unit, the cable run, circuit protection, fixing hardware and electrical testing.
- The overall cost depends on the distance between your consumer unit and the charger location.
- If your existing fuse board lacks spare capacity or adequate safety devices, any required board upgrade is itemised on its own line.
EV charger installation across Chineham
We serve Chineham from our base in Basingstoke.
What happens on the day
Every charging unit installation follows an orderly process, from reviewing the domestic electrical intake to completing all mandatory electrical safety checks before handing over the system.
- Fuse board and supply assessmentWe inspect your existing consumer unit, main fuse and bonding connections upon arrival. This confirms that the domestic electrical installation can safely take the added 7.4kW continuous demand of a home charging unit.
- Cable routing and unit mountingThe charging unit is secured firmly to the chosen exterior brickwork or garage wall. We clip the heavy-duty power cable along the discussed line, taking care around doorways, corners and external pipework for a tidy finish.
- Electrical testing and initial chargeBefore completing the job, we carry out instrumental dead and live tests on the new circuit, check earth loop impedance and test residual current devices. We then plug in the unit to verify that charging initiates properly.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose JD Electricals
- Reviews
- 13
- Rating
- 4.7
- Trading since
- 2009
“Most of my work is domestic: consumer units, full and partial rewires, lighting and EICRs on houses around Basingstoke. I test and certify everything I fit, and anything else I find while I am there gets priced separately rather than added quietly to the bill. The electrician who quotes your job is the one who does it.”
James Dunn, JD Electricals
Book NowPhotos of our work
Can my existing fuse board support a 7.4kW charger?
Many modern consumer units have adequate capacity and space for an additional 32-amp circuit. During our assessment, we inspect your main incoming fuse and existing circuit breakers to confirm that your electrical setup can safely handle the extra continuous load.
Where is the best place to position the charging unit?
The ideal spot is an external wall or garage wall directly adjacent to where you park the vehicle. We recommend positioning the unit so the charging cable reaches your car inlet easily without stretching tight or lying across garden walkways.
How long does installing a home charger take?
Most standard domestic installations take between three and five hours. The duration depends on the length of the cable path, whether cables pass through internal ceiling voids or external walls, and the position of your consumer unit.
Do you need to dig up the driveway to run the cable?
In most homes, cables can be neatly clipped along external brickwork, run through an attached garage, or routed through underfloor spaces. Surface clipping avoids the need to disrupt driveways, paving slabs or decorative lawns.
What paperwork do I receive after the charger is fitted?
You receive a formal electrical installation certificate detailing the circuit testing readings, proving that the installation complies with current UK wiring regulations and can be handed over to building control or future buyers.

