EICR in Hook
Need an EICR for a Hook rental property or home? JD Electricals inspects the fixed wiring, consumer unit, sockets and lighting, then provides a clear electrical report. For rented homes, the inspection is required at least every five years, with any remedial work quoted separately from the test.
Calls answered 24/7
- 17 years trading
How electrical inspection pricing works
Our pricing for an electrical installation condition report is fixed upfront with no hidden add-ons. The cost covers the physical inspection, testing of circuits, and the completed written report.
From £200
Included
- A visual check of the fuse board, wiring and accessories
- Dead and live tests on the circuits at the consumer unit
- A written EICR with codes for anything that fails
- Testing of accessible sockets, lights and fixed equipment
- A talk through the findings before we leave
Ways to pay


- Pay by bank
- Bank transfer
- The price covers thorough testing of the consumer unit and accessible circuits, alongside the completed safety report.
- Costs vary depending on the total number of consumer units and circuits needing testing within the property.
- Remedial repairs for any identified defects are priced separately on their own written quotation.
EICR across Hook
We serve Hook from our base in Basingstoke.
What happens on the day
We complete our tests with minimal disruption to your home, working methodically through the installation from the consumer unit outward to each circuit.
- Initial survey and circuit isolationOn arrival, we inspect the consumer unit and main incoming electrical equipment. Power is switched off in planned stages to allow detailed dead testing while keeping disruption inside the property as low as possible.
- Instrument testing of circuitsCalibrated test meters assess continuity, insulation resistance, and earthing across every reachable circuit. We examine the condition of wiring, socket outlets, lighting switches, and fused spurs throughout the home.
- Live testing and functional checksOnce power is restored, we verify fault-loop impedance and confirm that residual current devices trip within required time limits. Any observed defect receives a standard trade code based on safety severity.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose JD Electricals
- Reviews
- 13
- Rating
- 4.7
- Trading since
- 2009
“Most of my work is domestic: consumer units, full and partial rewires, lighting and EICRs on houses around Basingstoke. I test and certify everything I fit, and anything else I find while I am there gets priced separately rather than added quietly to the bill. The electrician who quotes your job is the one who does it.”
James Dunn, JD Electricals
Book NowPhotos of our work
What is an EICR?
An Electrical Installation Condition Report is a formal document produced following a detailed inspection and testing of a property's fixed wiring, consumer unit, and electrical accessories to confirm they are safe to use.
Do landlords in Hook need an EICR?
Yes. Private landlords in England must have electrical installations inspected and tested at least every five years, or at the start of a new tenancy, with a copy supplied to tenants.
How long does an electrical inspection take?
The duration depends on property size and the number of circuits present. A typical domestic inspection usually takes several hours to examine the consumer unit, complete meter testing, and inspect accessories.
What happens if defects are discovered during testing?
Defects receive standard trade codes based on safety severity. If urgent repairs are needed to make the system satisfactory, we provide a separate written quotation detailing the required work.
Will the power be switched off during the inspection?
Yes. Power must be isolated for parts of the inspection to carry out dead tests safely. We isolate circuits in stages where possible to minimise disruption while we work.

