Electrician in Bramley

JD Electricals completes consumer unit replacements, EICRs and EV charger installations for homeowners and landlords in Bramley, Hampshire and RG26.

4.7 (13 reviews)Calls answered 24/7

  • 17 years trading

Services in Bramley

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer

Parts of Bramley we cover

We serve Bramley from our base in Basingstoke.

The StreetBramley Green RoadMinchens LaneCufaude LaneSilchester RoadSherfield RoadVyne RoadLongbridge Road

4.713 reviews

“Reliable and professional. Responded swiftly and carried out work in timely manner. Reasonable quotes. Highly recommend James and his team. Thank you for your help”

Ashish P.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose JD Electricals

Photo of James DunnJames DunnElectrician
Reviews
13
Rating
4.7
Trading since
2009
“Most of my work is domestic: consumer units, full and partial rewires, lighting and EICRs on houses around Basingstoke. I test and certify everything I fit, and anything else I find while I am there gets priced separately rather than added quietly to the bill. The electrician who quotes your job is the one who does it.”

James Dunn, JD Electricals

Book Now

Photos of our work

Cable tray run across a commercial roof beside a solar array
Consumer unit wired into a domestic wall, cover off
Meter, isolator and supply tails in a service riser
Control gear and a switched socket wired inside an equipment cabinet
Circular LED bulkhead lights in a commercial corridor
Bulkhead lighting along a corridor being finished

Frequently asked electrical questions

Still have a question?

What is an EICR and why is it needed?

An Electrical Installation Condition Report assesses the safety of the fixed wiring in a property. It identifies damaged cables, overloaded circuits, incorrect earthing, and lack of residual current protection. Landlords must have an EICR completed at least every five years, and homebuyers often request one before exchanging contracts.

How long does a consumer unit replacement take?

Replacing an old fuse board with a modern consumer unit typically takes between four and eight hours. The process includes isolating the main supply, removing the old enclosure, fitting new protective devices, reconnecting all circuits, and performing testing on every single circuit.

Will a house rewire cause damage to existing walls?

Rewiring requires running cables under floorboards, through ceiling voids, and down walls to socket and switch boxes. Careful chasing and routing keep disturbance to a minimum, and back boxes are positioned cleanly so that wall surfaces can be made good smoothly.

Can extra power sockets be added to an existing ring circuit?

Extra socket outlets can be wired as spurs or integrated directly into existing ring final circuits, provided testing confirms the existing cable and circuit breaker can safely accommodate the additional demand. If the circuit is already heavily loaded, a new radial circuit can be run from the consumer unit.

What power supply is required for a 7.4kW home car charger?

A 7.4kW electric vehicle charger requires an uninterrupted single-phase 230V AC connection capable of delivering 32 amps. The installation involves running a dedicated cable from your consumer unit, protected by an appropriate circuit breaker, and fitting surge protection where required.

Book or ask a question

Calls answered 24/7